Incrementality Testing & Analysis Onboarding
Overview of the Rockerbox Incrementality Testing Process
Rockerbox incrementality testing is designed to help brands identify point-in-time incrementality of a channel / tactic / vendor, and can be used to calibrate both an MMM or MTA.
Key Phases of Incrementality Testing
Phase No. | Phase Description | Purpose | Responsible Party | Estimated Duration |
1 | Testing Kickoff | Align on testing priorities and data collection requirements | Rockerbox + Client | n/a |
2 | Testing Design | Design a test and present to client | Rockerbox + Client | 1 week |
3 | Test Execution | Execution of incrementality test | Client | Variable, typically at least 4 weeks |
4 | Test Analysis | Collect data from test and analyze results | Rockerbox + Client | 2 weeks |
5 | Incrementality Results Presentation | Present the result of the incrementality test | Rockerbox + Client | n/a |
Existing Test Results Analysis (test not designed by Rockerbox)
In the event that Rockerbox is only doing the analysis of an already designed / executed test, we will still have a kickoff call to discuss analysis priorities and cover open questions.
For data requirements, Rockerbox will request the following:
- Full test design, including details of holdout DMA's, spend allocation, test duration, and any other notable spend details from other channels
- DMA level order information by day before, during, and after the test
Once the test has been concluded and all required data has been collected, Rockerbox expects to have the analysis ready for presentation within 2 weeks.